For difficult groundworks and foundation base problems we at PowerCem are happy to provide sensible sustainable engineered answers.
Constructing an 80 tonne per m2 crane platform from wet alluvium in-situ soils, designing a crack free large, shed settlement free subbase in 4m of in-situ PFA.
These and similar stabilisation challenges require different thinking and a very a different product. Our RoadCem zeolite particle wrapping technology provides us with the tool to deal with mixed/weak ground conditions, which can include made ground, alluvium, silts and peats.
Not forgetting high sulphate clays.
Call our technical helpline for advice: 0800 756 1360
Comentários